Twenty (20) lane miles of Interstate 155, in Pemiscot County, required a superpave asphalt overlay which required pavement repair, concrete cross stitching, cold milling, guardrail upgrades, and superpave asphalt. Bacon Farmer Workman (BFW) was entrusted with multiple...
Edison Middle School required new additions and renovations to the existing interiors. To accomplish these goals, Bacon Farmer Workman (BFW) provided the following work: Additions to the Northwest of the Main 3-Story Building: New, larger precast gym Adjoining single...
Cape Special Road District needed to remove and replace the 3-span bridge on County Road 657 over Scism Creek. For this $650,000 project, Bacon Farmer Workman (BFW) provided preliminary engineering, survey, and administration services including: Engineering: Complete...
Bacon Farmer Workman (BFW) collaborated with Architechniques limited to construct the Christopher Rural Health Primary Clinic (CRHPC). From Architechniques limited, Steve Sims was the lead architect, and Josh Alstat and his team were responsible for the structural...
Working with Baysinger Architects, Bacon Farmer Workman (BFW) designed the 1250 sq. ft. Tamaroa Grade School Cafeteria Addition; BFW created the full structural design for the addition. The design ensured the addition was strong, long lasting, and safe, and it...
Recent Comments