Real Life Sango

Marcum Engineering collaborated with Rufus Johnson and Associates to design the Real Life Sango church facility. This 31,100 sq-ft facility was designed for fellowship, worship, and education. Marcum Engineering completed the following designs: Fire Protection...

The Paducah Transient Boat Dock

The Paducah transient boat dock portion of the Riverfront Development Phase 1B included design and construction of the three-section gangway access to the fueling dock and the overall design for the 340-foot transient dock facility. For transient boaters, the...

North Thompsonville Road TARP

The North Thompsonville Road TARP project included a 2.15-mile project to upgrade from an oil/chip roadway to provide an HMA wearing surface with a 3’ wide aggregate wedge shoulder for the entire 2.15-miles. To fulfill the project needs, Bacon Farmer Workman (BFW)...

Schlenker Road Bridge Replacement

The Schlenker Road Bridge Replacement project included all PE I & II design services necessary to bridge this structure replacement project to an IDOT letting. To complete this project, a variety of services were required such as: Complete field surveys...

Marion Jr. High Locker Room

For the Marion Jr. High Locker Room renovation, Bacon Farmer Workman (BFW) collaborated with Baysinger Architects, as the lead architect. Josh Alstat and his team handled the structural design, which included a 2,300-square-foot renovation. The project required BFW to...