Schlenker Road Bridge Replacement

The Schlenker Road Bridge Replacement project included all PE I & II design services necessary to bridge this structure replacement project to an IDOT letting. To complete this project, a variety of services were required such as: Complete field surveys...

Marion Jr. High Locker Room

For the Marion Jr. High Locker Room renovation, Bacon Farmer Workman (BFW) collaborated with Baysinger Architects, as the lead architect. Josh Alstat and his team handled the structural design, which included a 2,300-square-foot renovation. The project required BFW to...

Harco Road TARP Resurfacing

Bacon Farmer Workman (BFW) performed Phase III construction engineering on an eight-mile hot mix asphalt resurfacing project on Harco Road in Saline County, Illinois. The Phase III construction inspection included: Layout and inspection of hot mix asphalt milling Butt...

First Baptist Church Paducah Renovation

Marcum Engineering collaborated with PFGW Architects to design the First Baptist Church Paducah Renovation. Marcum Engineering updated and renovated the: Youth Area Library Restrooms In addition, Marcum Engineering created design improvements for the following...

Murray State University Lovett Auditorium

The Murray State University Lovett Auditorium  was originally built without modern HVAC systems; this 23,900-square-foot facility required a highly detailed design approach to preserve its original appearance. For this historic renovation project, Marcum Engineering...