Seven Brew

Bacon Farmer Workman (BFW) was excited to have been able to plan the Seven Brew drive through coffee shop. To complete this plan, Bacon Farmer Workman (BFW) provided: Preparation: Survey Services Engineering Services: Geotechnical Civil Location: Murray,...

Murray State University Practice Facility

Bacon Farmer Workman (BFW) was entrusted with the Murray State University (MSU) Practice Facility expansion to the CFSB Center. For the addition, many preparations and services were required to ensure the addition would serve for decades to come; BFW provided:...

Real Life Sango

Marcum Engineering collaborated with Rufus Johnson and Associates to design the Real Life Sango church facility. This 31,100 sq-ft facility was designed for fellowship, worship, and education. Marcum Engineering completed the following designs: Fire Protection...

The Paducah Transient Boat Dock

The Paducah transient boat dock portion of the Riverfront Development Phase 1B included design and construction of the three-section gangway access to the fueling dock and the overall design for the 340-foot transient dock facility. For transient boaters, the...

North Thompsonville Road TARP

The North Thompsonville Road TARP project included a 2.15-mile project to upgrade from an oil/chip roadway to provide an HMA wearing surface with a 3’ wide aggregate wedge shoulder for the entire 2.15-miles. To fulfill the project needs, Bacon Farmer Workman (BFW)...