by Missy Faughn | Apr 28, 2025
Bacon Farmer Workman (BFW) collaborated with Steve Sims as the lead architect, from Architechniques Limited, on the Herrin JHS Gym and Cafeteria addition. From BFW, Josh Alstat and his team were responsible for the entire structural design for this portion of the...
by Missy Faughn | Apr 28, 2025
Bacon Farmer Workman (BFW) collaborated with Alex Knight of Iron Knight’s Welding, who was the steel fabricator and erector, to complete the Oasis Sports Complex dugout project in Marion, Illinois. Josh Alstat, PE, SE, and his team from BFW were responsible for the...
by Missy Faughn | Apr 28, 2025
Bacon Farmer Workman (BFW) collaborated with Baysinger Architects for the Perry County Highway Department Facility project in Pinckneyville, Illinois. Jake McCann, from Baysinger Architects, acted as the lead architect while multiple teams from BFW handled other...
by Missy Faughn | Mar 27, 2025
The Alpa Delta Pi sorority house on the University of Illinois Urbana-Champaign campus required renovations totaling to a three-million-dollar project. Bacon Farmer Workman’s (BFW) Champaign, Illinois, office was entrusted with providing the structural engineering...
by Missy Faughn | Mar 17, 2025
In the Varney River Drainage District jurisdiction, the MoDOT SE District required plans for the Route A over the Main Ditch, Bridge No A9312, project. BFW accepted the project and provided design engineering services such as: Preliminary roadway plans Final roadway...
Recent Comments