Schlenker Road Bridge Replacement

The Schlenker Road Bridge Replacement project included all PE I & II design services necessary to bridge this structure replacement project to an IDOT letting. To complete this project, a variety of services were required such as:

  • Complete field surveys
  • Environmental survey requests
  • Hydraulic analysis
  • Soil borings
  • Geotechnical analysis
  • Detailed road/bridge plans
  • Special Provisions
  • Submittals:
    • Bridge condition report
    • Preliminary bridge design and hydraulic report
    • Joint permit application to the Corps of Engineers, IDNR and IEPA

While managing all of these processes, Bacon Farmer Workman / Marcum Engineering successfully completed the Schlenker Road Bridge Replacement project.