This project entailed all PE I & II design services necessary to bridge this structure replacement project to an IDOT letting. Work on this project required complete field surveys, environmental survey requests, hydraulic analysis, soil borings, geotechnical analysis, submittal of a bridge condition report, submittal of a preliminary bridge design and hydraulic report, submittal of a joint permit application to the Corps of Engineers, IDNR and the IEPA, as well as detailed road/bridge plans and special provisions.