The Schlenker Road Bridge Replacement project included all PE I & II design services necessary to bridge this structure replacement project to an IDOT letting. To complete this project, a variety of services were required such as:
- Complete field surveys
- Environmental survey requests
- Hydraulic analysis
- Soil borings
- Geotechnical analysis
- Detailed road/bridge plans
- Special Provisions
- Submittals:
- Bridge condition report
- Preliminary bridge design and hydraulic report
- Joint permit application to the Corps of Engineers, IDNR and IEPA
While managing all of these processes, Bacon Farmer Workman / Marcum Engineering successfully completed the Schlenker Road Bridge Replacement project.