Drainage improvements were completed along a four-mile stretch of Kingshighway (US 61) through Cape Girardeau, Missouri. The project addressed ongoing erosion issues within multiple roadside ditches and focused on restoring proper drainage flow to protect the roadway and surrounding infrastructure.
Project Highlights:
- Grading and reshaping of roadside ditches to re-establish proper water flow
- Reinforcement of ditch lines with rock stabilization to prevent future erosion
- Replacement of deteriorated driveway pipes throughout the project limits
- Full contract administration services provided by BFW
- On-site project inspection and material testing
- Maintenance of detailed project documentation
- Verification that construction met MoDOT specifications, standard plans, and contract material requirements
Through comprehensive oversight and inspection services, BFW helped ensure the successful delivery of a project that improves drainage performance, enhances roadway durability, and supports long-term infrastructure reliability for the Cape Girardeau community.








