Unity High School Break Room

Tolono, Illinois – Champaign County

 

Bacon Farmer Workman Engineering & Testing, Inc. provided the structural engineering design for this new 1600 square foot Work Room Addition. The additional square footage provided a break room, workspace, and restrooms for the school faculty.

This addition provided ADA access to this end of the existing building, allowed for the renovation of some interior spaces, and freed up some interior square footage for better use by the school. Some structural reinforcement was provided to existing MEP tunnel adjacent to this addition. Construction was completed over the summer of 2015 on schedule.