Bacon Farmer Workman (BFW) managed the Pittsburg Road HSIP Rehabilitation Project and was instrumental in writing the grant to secure the HSIP funding for this project. To complete the project, BFW provided:
- Documentation:
- IDOT BLRS Phase I LAFO documents
- Contract plans
- Special provisions in compliance with IDOT policies
- Road Improvements:
- 4’ HMA safety shoulders
- Upgraded guardrail
- Pavement repairs
- Inlaid pavement striping
- RPMs throughout the entire 6.25-mile length of the project
Additionally, the project required a structural hot mix asphalt overlay designed in one thick lift surface to provide suitable thickness on the job. BFW is proud to have contributed to the improvement and increased safety of Pittsburg Road.