This $175,000 project consisted of the replacement of a structurally deficient single span bridge structure with a box culvert for the Cape Special Road District, including all preliminary engineering to prepare a complete set of roadway and structure plans and specifications for a local letting. BFW Engineering performed a topographic survey of the road and ROW, and channel/floodplain cross-sections up- and down-stream of the crossing. This project also involved the submittal of an Environmental Survey Request, submittal of a Preliminary Bridge Design and Hydraulic Report, and submittals and coordination necessary to receive Corps of Engineers Permits.