Murray State University Engineering – Physics
Murray, Kentucky – Calloway County
Bacon Farmer Workman and Marcum Engineering provided the civil/site design and mechanical, electrical and plumbing design on the Science Center Phase III Engineering & Physics Building. This third and final phase of the Science Complex will offer nearly 80,000 square feet of new building space that will consist of the following types of spaces: numerous classrooms, lecture halls, administrative space, library and multiple labs including both Astronomy labs and Chemistry labs. The project also includes the construction of the elevated connector bridge that connects this new facility to the existing Chemistry Building.