Dwina Road Bridge Replacement
Bacon Farmer Workman (BFW) was entrusted with the replacement of the Dwina Road Bridge that led to a local letting. To replace the bridge, BFW provided design, administration, survey, and analysis services such as:
- Design:
- PE I & II design services
- Detailed road/bridge plans
- Administration and Submittals:
- Permit applications
- Special provisions
- Submittal of a bridge condition report
- Submittal of a preliminary bridge design and hydraulic report
- Submittal of joint permit application to the Corps of Engineers, IDNR and IEPA
- Survey and Analysis:
- Field surveys
- Environmental survey requests
- Hydraulic analysis
- Soil borings
- Geotechnical analysis
BFW is proud to have conducted the Dwina Road Bridge Replacement project from start to finish with care taken at each step to provide a complete, permitted, and safe product.