Bacon Farmer Workman Inc. (BFW) provided comprehensive Preliminary Engineering Phase I and II design services for the Crestwood Road Bridge replacement in Massac County, Illinois. The project required detailed coordination across environmental, structural, and hydraulic disciplines to meet IDOT letting requirements and ensure full regulatory compliance.
Project Scope and Deliverables:
-
Complete field surveys to support accurate planning and design
-
Environmental Survey Request (ESR) coordination
-
Hydraulic analysis and submittal of Hydraulic Report
-
Geotechnical investigations, including soil borings and analysis
-
Submittal of a Bridge Condition Report
-
Preliminary bridge design development and IDOT coordination
-
Submittal of Joint Permit Application to the U.S. Army Corps of Engineers, IDNR, and IEPA
-
Preparation of detailed roadway and bridge plans with supporting special provisions
Regulatory and Coordination Highlights:
-
Alignment with IDOT letting requirements and project development process
-
Environmental permitting through multiple state and federal agencies
-
Integration of hydraulic and geotechnical findings into final design
BFW is proud to support Massac County with infrastructure solutions that improve safety, connectivity, and long-term roadway performance.