Sangamon Valley Trail Extension

BFW was proud to provide engineering and construction services for the development of a new bicycle and pedestrian trail just north of Springfield, Illinois. This project transformed an abandoned railroad corridor into a safe and accessible multi-use path, connecting the community to new recreation opportunities.

Project Highlights

  • Provided Phase II Preliminary Engineering and Phase III Construction Engineering services
  • Designed a 2.0-mile, 10-foot-wide trail with HMA surface on an aggregate base
  • Created a new trailhead parking lot at the north end of the project
  • Trail alignment intersected four township roads in a rural setting
  • Design completed in less than 5 months
  • BFW performed all construction inspections and documentation
  • Total project cost: $1.6 million, funded through ITEP

This trail project not only repurposed a piece of local history but also provided residents and visitors with a safe, scenic route for biking, walking, and connecting with the outdoors.